| Coal Crushing and Conveying Material Handling System |
|
The
project's scope of work consists of:
|
| Frac Sand Plant |
![]() |
|
CCC's Salt Lake City team was awarded full
construction responsibility to build a new FRAC-Sand Plant. The scope
of work included, civil, foundations, structural steel and capital
equipment installations. The project consisted of truck and rail
load-out facilities, feed and transfer conveying systems, dryer feed
transfer, scrubber, and other associated process equipment.
|
| Gypsum Processing Mill Expansion |
![]() |
|
|
| Pre-heater Tower Modification |
|
| The
project consisted of major modifications to an existing Preheater Tower.
Approximately 175 tons of new structural steel were added to the
existing structure, to increase the height by 120 ft.
The existing ductwork was removed and 170 tons of new 108-inch
diameter duct was installed. The
scope also included installation of two new I.D. fans, miscellaneous screw
conveyors and a water spray equipment room.
Due to production needs the schedule was very aggressive following
two months of preparatory work, the installation of the new duct and
equipment included commissioning. The work was completed in
4-weeks, for each kiln line. |
CCC Group, Inc. provides a broad range of general construction and manufacturing services to various industries throughout the U.S. and in select foreign markets.