| Bulk Material Handling Terminals |
Tampa, Florida |
|
New Rail Loading System for Bulk Material Terminal. Scope included concrete, wooden structure and electrical for 3 Conveyors, Rail Scale, Drag Conveyor and Bucket Elevator as well as associated hoppers. Work was performed in very active terminal with limited space. Also included various maintenance tasks pertaining to other parts of the terminal.
Approx. Manhours 17,500 |
|