Oil Field Construction

Projects

 

Project 1 | Project 2 | Project 3

 

oil-field project1 1oil-field project1 2oil-field project1 3oil-field project1 4

Riley Exploration – Oil Field Pad Sites

  Eagle Ford Shale Region – South Texas

 

CCC Group acts as an Oil Field Construction partner for the preparation of and reclamation for all of Riley Exploration's Eagle Ford Operations. CCC Group acts as Riley's Oil Field Construction partner to quickly and safely execute pad sites throughout the Eagle Ford Shale Oil Play in South Texas.

CCC Group's Oil Field Construction Team scope of work includes:

  • Clearing Right of Ways
  • Build Locations
  • Erosion Control
  • Frac Sand Pits
  • Pipelines & Welding
  • Concrete Work
  • Equipment Placing
  • Material Handling
  • Reclamation
  • Dozer Services
  • Laser Grading
  • Welding
  • Back Hoe Services
  • Paving
  • Entrances
  • Fencing
  • Crane Services
  • Site Clean-Up

 

 


 

Project 1 | Project 2 | Project 3

 

oil-field project2 1oil-field project2 2oil-field project2 3oil-field project2 4
 

 

Badger Mining - Frac Sand Terminal

 George West, TX

CCC Group acted as General Contractor for the construction of Badger Mining's newly established regional frac sand storage and terminal location in George West, Texas.  This facility was established in order to service the growing Eagle Ford Shale Oil Field activities.

CCC Group scope of work included:

  • Civil site work, including site preparation and development
  • Vertical and horizontal concrete work including reinforcement
  • Construct tie-in into existing railroad system
  • Structural steel erection
  • Heavy rigging and erection
  • Staging and setting of all equipment and storage facilities

 

 

Back to Top

 


 

Project 1 | Project 2 | Project 3

 

oil-field project3 1oil-field project3 2oil-field project3 3oil-field project3 4

TexStar - Midstream Highway 97 Truck Terminal

  Eagle Ford Shale, South Texas

 

CCC Group was contracted by Prime Controls for the installation of all electrical work on TexStar Midstream's new Truck Terminal on Highway 97 in the heart of the Eagle Ford Shale. This facility was established by TexStar Midstream in order to service the growing Eagle Ford Shale Oil Field activities.

CCC Group scope of work included:

  • Installation of 4 main line pumps
  • Installation of booster pumps
  • All required instrumentation
  • Switch gear installation
  • Generator installation
  • Cable tray installation
  • Underground raceway
  • Electrical cabling and terminations

 