Having in-house fabrication, machining, and industrial coating facilities, along with a hydraulic repair shop has allowed CCC to provide full service capabilities to many clients, a few include…..
ALCOA
Brake Supply
Commercial Metals
Drake Cement
Fluor Daniel
Gerdau Ameristeel
Gulf Marine
International Paper
Invista
National Oilwell
North American Coal
Philippi-Hagenbach, Inc.
Polysius
Seadrift Coke, L.P.
Southwest Research Institute
Sherwin Alumina Company (formerly Reynolds Metals Co.-Sherwin Plant)
South Texas Mining Venture
Stewart & Stevenson Services
Texas Industries, Inc. (TXI)
Metso Texas Shedder
TWF Services
CCC Group offers complete ASME certified industrial machine and fabrication facilities providing hydraulic repair, specialty steel and heavy fabrication services.
CCC’s primary fabrication facility is located in San Antonio, Texas at our corporate headquarters. With over 114,000 sq. ft. of shop space under roof and 19 acres of lay down area, we are well equipped for a broad range of specailty and heavy industrial projectes destined for industries in the U.S. and abroad.
In addition to the San Antonio fabrication shop, CCC Group has additional fabrication shops in the Houston, Texas and Pierce, Florida.
San Antonio Fabrication Shop Features:
65,000 sq.ft. under roof – fabrication
ASME certified since 1976
Stamps (plant & field)
U – Pressure Vessels - Section 8, Division 1
S – Power Boilers Section 1
R – Repair of Vessels (Plant & Field Locations on all stamps) NBIC
We have produced several hyperbaric chambers for the medical industry. This hyperbaric chamber project is the WORLD'S FIRST ASME/PVHO Rectangular Chamber. Its pressure rating is 3 ATA (atmospheres).
Scope of work:
Fabrication
Machining
Welding
Painting
Shredders for Recycling Industry
We have produced over 125 automobile scrap shredders since 1982.
Shredders range in size and throughput capacity. The larger shredders can process up to 350 tons of scrap per hour.
Fabrication requires…
Extensive flame cutting
Beveling
Fitting
Welding of plate thicknesses from 1 inch to 6 inch.
After painting the different components, the shredder is stacked and the hydraulic plumbing is installed.
Fabrication for Cement Industry
The fabrication shop has completed numerous projects for the cement industry.
This particular project’s scope included:
Calciner Riser Ducts
Pyro Top
Vessels
Connecting Ducts
Painting was completed in our enclosed industrial coating facility. The ducts were all oversized, permitted loads and were shipped to the jobsite. The installation in the field was handled by our cement division and included the erection of structural steel, preheater components, and all associated mechanical, piping, scaffolding and welding.