Home Site Index
Back to CCC Group Home Page.Back to CCC Group Home Page. ENR 2010 Top 400 Firm

International
 

CCC has traveled to many countries to assist key clients with their foreign operations’ capital and maintenance projects. From being responsible for the complete construction management of new facilities to assisting with ongoing capital improvement projects, CCC brings the same high performance to every project site, regardless of location.

  • Alcoa
  • Coastal Aruba
  • Drummond Coal
  • Etema Ltd.
  • Iron Ore of Canada
  • Jamalco
  • Mannesmann Demag Delaval
  • Mount ISA Mines, Ltd.
  • NB Coal
  • Rexam (previously ANC)
  • Rolleston Developments Pty Ltd.
  • Suralco
  • Tarmac America
  • Metso Texas Shredder, Inc.
  • Vancan SA de CV


#43 Among Top 50 Contractors in the U.S. Working Abroad
(As ranked by Engineering News Record, Sept. 19, 2011)



CCC’s commitment to its clients has no boundaries. 
Australia

Germany

Brazil

Jamaica

Canada

Senegal

Colombia

Suriname

   
In providing such a broad range of construction services, many clients have invited us to participate in their operations abroad.  We have become proficient in both logistical and administrative issues required for executing a successful project outside the U.S.  Often, these issues are equally as critical as the construction. Further, we remain steadfast to our safety and quality commitment REGARDLESS of our project's location.  When working abroad we are considerate of the host country’s policies, workforces and culture. 

 

 

 

 

 


Mining Equipment Relocation & Installation
Colombia, South America


Project involved:

  • Dismantle of 13 million pounds of dragline equipment and the accompanying material handling system from a copper mine from Arizona
  • Transporting 450 trailer loads of equipment to Houston for overseas shipment to Colombia, South America.
  • Disassembly and shipping of 3000 tons of mining equipment from Germany to Colombia 
  • Rebuilt and erected complete systems
    • 72” Wide Conveyors
    • Mobile Sizers
    • Mobile Apron Feeders to move the overburden to Mobile Transfer Conveyors
    • Mobile spreader for spoil distribution.
  • All electrical and mechanical for entire system
  • Project Management
  • On-site supervision
  • Technical expertise

 

Wheel Rim Production Plant
Mexico

Design-Build of “grass roots” plant for the production of wheel rims for large trucks and trailers.

Process Building & Office Installation

Equipment Installation

  • Automated conveying lines
  • Large forging presses
  • Heat treating ovens
  • Robotic positioners
  • Automated machining centers
  • Finishing equipment

Civil Scope

  • Site preparation
  • Building and equipment foundations
  • All underground utility installation

Electrical Scope

  • Incoming power and substation
  • Building utility power
  • Process equipment power & control wiring

Supervision

CCC was tasked with the supervision of local labor for all aspects of the mechanical, electrical, civil, and structural work. This also included supervising paving, substation installation, zero discharge water treatment system and the finish-out of the office building.

Other Tasks

In addition, CCC oversaw the safety, quality control, subcontract pre-qualification process, scheduling, budget estimating and complete contract administration. 

Despite the owner’s market delays on the product and the addition of a $30M extrusion mill on the same property, which was executed by the on-site team, the original budget objectives were still met. Plus, the project received the owner’s highest safety award, in a market that has not traditionally placed a premium on safety.

 

Project 4 for International 

Insert description here

 
 
 
 
 
 © 2008 CCC Group, Inc.