Petrochem
 
Although a strong concentration of our petrochem clients are along the Gulf Coast region, we have worked in many petrochem facilities throughout the U.S. for several prominent industry leaders.   
  • BP
  • Ethyl Corporation
  • Flint Hills
  • Marathon
  • Praxair, Inc.
  • Rhodia
  • Shell Refining
  • Valero
 

#6 Among the top 25 Contractors working in Chemical Plants
(As ranked by Engineering News Record, Sept. 19, 2011)



CCC has a thorough understanding of the petrochem processes, systems, work environments and unique requirements. 
Our teams are flexible to adapt to your needs, operational goals and scopes of work.
 
Typical Scope
  • Pipe Fabrication & Erection
  • Specialty Fabrication (equipment & vessels)
  • Coded Repairs
  • Specialty Welding
  • Equipment Setting
  • Heavy Structural Erection
  • Heavy Rigging
  • Concrete
  • Civil (above & below ground)
  • Heavy Demolition & Dismantle
  • In-plant asphalt paving
Specialized Petrochem Services
Capital Projects
We excel in civil, structural, electrical, instrumentation, equipment setting, piping and welding services.  We understand as projects move from design to installation, they must move quickly and efficiently.  CCC focuses on providing a strong team to support this effort.  Through our alliances with like-minded support services, we can complete the project safely, with quality as a key premise, timely delivery of the completed work and remain determined to meet budget.  Our team is up to the challenge for your next project.


Turnarounds and Shutdowns
By their very nature, turnarounds and shutdowns require an extremely fast paced work environment, all the while maintaining meticulous documentation of all tasks and accomplishments.  We have continually proven that even in these intense projects, we maintain CCC’s high standards of safety and performance.   


Maintenance & Supplemental Maintenance

Whether your facility needs a long term maintenance team or one to simply supplement your ongoing maintenance efforts, CCC is flexible to adapt to your needs.


Fabrication & Welding

Fabrication projects destined for the petrochem industry are continuously flowing through our shops.  We provide services for capital projects such as vessels, structural iron, component pieces and piping systems.  This allows synergies to develop in the field as CCC becomes the fabricator and installer.  This lowers costs by reducing the number of groups involved in your project


Extractor Services

Distinct advantage for turnkey heat exchanger projects
Only self-propelled aerial extractor made
16' to 40' bundle carriage: 13' height
Will walk with 50 tons and will turn within its own length
Will pull 105" x 46' - 50 tons
Extraction of bundles possible at elevations of 80' to 90' in the air


Turnaround – Hydrogen Unit
Houston, TX

Scope of Work: 
  • Pulled tube bundles, hydroblasted them clean, inspected them, made necessary repairs and reinstalled them
  • Exchangers were tested and made ready for service
  • Modified package boiler unit and installed additional flow paths in the boiler and reassembled it.
  • Scrubber installation
  • Numerous piping packages
  • Coded repairs to pressure vessels
  • Managed several subcontractors and responsible for bulk purchasing for the entire turnaround

 

Installation Wet Gas Scrubber
Houston, Texas

Scope of Work:

  • All mechanical and electrical installations for the complete system.  
  • Setting equipment, piping (alloy systems), setting pumps and motors, setting vessels and clarifier tanks and mixers.   
  • Electrical work entailed tying into the MCC’s.
  • Installed ductwork and structural iron
  • OSBL installation of 6,000 ft. of pipe from the scrubber unit to the environmental treaters.   
  • Testing the system and start-up assistance

 

Petrochem Fabrication Project
Cryogenic Skid Units

Destined for Dubai

This fabrication project was completed in the Houston fabrication shop.  The two cryogenic skid units are part of a compressor train being installed at a new facility in Dubai.

The skid’s structural components, supports, knockout vessels, piping and lifting bar were all fabricated in our shop.  In-line controls equipment, painting and insulation were also completed prior to shipment overseas.  

The vessels and piping systems of the units are 95% alloy materials.  This product gives testament to the fabrication shop’s ability to cater to the petrochem industry and produce high quality workmanship.   This key component was tested and delivered on-time. 

 


 

 
 